


New project: working on the design of the new ClimateChangeTheatre @ Science North, Ontario Canada. Collaboration with Show Communications, Kingston / Canada
Forschungsauftrag für Henry van de Velde´s “Haus Hohe Pappeln” in Weimar. Im Auftrag der Klassik Stiftung Weimar entwickeln wir in den nächsten Monaten eine denkmalpflegerische Zielstellung für die Architektur-Ikone, die auch Überlegungen zum Nutzungskonzept des historischen Gebäudes einschließen wird.
We present our re-creation of a 80′s style family home. The interior of this house was stripped down to the bare walls and we developed the new floor plan, structure and the interior design. We designed the kitchen with concrete counter top, rope nets for the stairs and all of the custom made furniture.
“Work in progress”. Just a few days left to finish the interior. The picture shows the welcome desk with a sandstone surface. We found a contractor in Porta Westfalica who was able to deliver 2 mm thin, highly flexible layers of stone. The stone is water jet cutted from big blocks. Size of the panels 1.15 x 2.85 m. Grand Opening 2nd week of December.
Nur noch wenige Tage bis zur Fertigstellung des Innenausbaus der Praxis. Empfangsbereich: Counter mit einer gebogenen Oberfläche aus Sandstein. Wir haben einen Lieferanten in Porta Westfalica gefunden, der in der Lage ist, 2 mm dünne, hochflexible “Schichten” per Wasserstrahl von grossen Sandsteinblöcken zu schneiden. Die einzelnen “Platten” haben die Rohabmessung 1.15 x 2.85 m. Eröffnung in der 2ten Dezemberwoche.